SIRGAS95

SIRGAS95 Coordinates | Report

The first GPS SIRGAS campaign was carried out from May 26 to June 4, 1995 and included 58 stations over South America. It was measured thanks to a common effort between the participating South American organizations and the contributing European and North American institutions to make possible the availability of the required GPS receivers and operators. This campaign was independently processed by DGFI (Deutsches Geodätisches Forschungsinstitut) and NIMA (US National Imagery and Mapping Agency, today NGA: National Geospatial-Intelligence Agency). DGFI used the Bernese software v. 3.4 with some modifications implemented at DGFI, and NIMA used the GIPSY-OASIS II software. After applying a seven parameter similarity transformation (Helmert transformation) the maximum difference between the two solutions was 3,5 cm with RMS differences of ±1,0 cm in X, ±1,4 cm in Y, and ±0,7 cm in Z. These discrepancies are well-explained by the different satellite orbits applied by the two processing centres, and the different treatment of the elevation angle dependent phase centre variations in each individual analysis. The final combined SIRGAS95 solution is given in ITRF94, epoch 1995.4.

Downloadable maps

SIRGAS95 (colour, with labels): JPG | PNG | PDF | PS

SIRGAS95 (colour, w/o labels): JPG | PNG | PDF | PS

SIRGAS95 (b/w, with labels): JPG | PNG | PDF | PS

SIRGAS95 (b/w, w/p labels): JPG | PNG | PDF | PS

SIRGAS95

Coordenadas SIRGAS95 | Relatório

A primeira campanha GPS do SIRGAS, foi realizada do dia 26 de maio ao dia 4 de junho de 1995 e incluiu 58 estações distribuídas na América do Sul. As medições foram possíveis graças aos esforços entre entidades sul-americanas, europeias e norte-americanas, que colocaram à disposição equipamentos GPS e técnicos operadores. As medições foram processadas de forma independente pelo DGFI (Deutsches Geodätisches Forschungsinstitut) e NIMA (US National Imagery and Mapping Agency, atual NGA: National Geospatial-Intelligence Agency). O DGFI utilizou o software Bernese, v. 3.4, com algumas modificações implementadas no DGFI, enquanto o NIMA utilizou o software GIPSY-OASIS II. A comparação das soluções por meio da transformação de similaridade com 7 parâmetros (Transformação de Helmert), resultou em uma diferença máxima de 3,5 cm com um RMS de ±1,0 cm em X, ±1,4 cm em Y y ±0,7 cm em Z. As discrepâncias são explicadas pelo fato das órbitas dos satélites aplicadas pelos dois centros de processamentos serem diferentes e da dependência das variações do centro de fase da antena com relação ao ângulo de elevação não ter sido levada em conta na solução do NIMA. A solução final combinada do SIRGAS95 está referenciada ao ITRF94, época 1995,4.

Mapas para download

SIRGAS95 (em cores, com nomes): JPG | PNG | PDF | PS

SIRGAS95 (em cores, sem nomes): JPG | PNG | PDF | PS

SIRGAS95 (b/p, com nomes): JPG | PNG | PDF | PS

SIRGAS95 (b/p, sem nomes): JPG | PNG | PDF | PS

SIRGAS95

Coordenadas SIRGAS95 | Reporte

La primera campaña GPS de SIRGAS fue llevada a cabo entre el 26 de mayo y el 4 de junio de 1995. Ésta incluyó 58 estaciones distribuidas en América del Sur y su medición fue posible gracias al esfuerzo combinado de entidades suramericanas, europeas y norteamericanas que pusieron a disposición los equipos GPS y operadores necesarios para toda la red. Las mediciones fueron procesadas independientemente por el DGFI (Deutsches Geodätisches Forschungsinstitut) y NIMA (US National Imagery and Mapping Agency, actualmente NGA: National Geospatial-Intelligence Agency). DGFI utilizó el software Bernese, v. 3.4 con algunas modificaciones implementadas por ese Instituto, mientras que NIMA trabajó con el software GIPSY/OASIS II. La comparación de las soluciones a través de una transformación de similitud de siete parámetros (transformación de Helmert) arrojó como máxima diferencia 3,5 cm con RMS de ±1,0 cm en X, ±1,4 cm en Y y ±0,7 cm en Z. Las principales causas de estas discrepancias se basan en que se utilizaron diferentes efemérides satélitales en los procesamientos individuales y en que la dependencia de las variaciones de los centros de fase con respecto al ángulo de elevación no fueron tenidos en cuenta en la solución de NIMA. La solución final combinada de SIRGAS95 está referida al ITRF94, época 1995.4.

Mapas para descargar

SIRGAS95 (a color, con nombres): JPG | PNG | PDF | PS

SIRGAS95 (a color, sin nombres): JPG | PNG | PDF | PS

SIRGAS95 (b/n, con nombres): JPG | PNG | PDF | PS

SIRGAS95 (b/n, sin nombres): JPG | PNG | PDF | PS

Scroll to top